hello@oneltd.com

HQ: +44 (0) 1905 362 300   |   London: +44 (0) 208 0596 526   |   Birmingham : +44 (0) 121 312 3876   |   Cardiff : +44 (0) 2920027983   |  

hello@oneltd.com

HQ: +44 (0) 1905 362 300   |   London: +44 (0) 208 0596 526   |   Birmingham : +44 (0) 121 312 3876   |   Cardiff : +44 (0) 2920027983   |  

Hampton by Hilton Hotel and Mixed Development

ONE’s Mechanical and Electrical Engineers were commissioned by Tolent, the main contractor, to deliver the M
and E solution for a new, efficient Hampton by Hilton hotel on Torquay’s picturesque harbourside.

Download Project
Location

Torquay

Client

Tolent Construction Ltd

Value

£10m

Services

Building Services,

Project Overview

The brand-new hotel, with 136 bedrooms as well as four retail units and two floors for CAT-A offices, was completed in April 2021.

Working for the main contractor, who had been appointed by the developer THAT Group, ONE managed the design process and provided the full detailed M and E design package.

The team produced the schedules and scopes of work and attended site regularly. The final solution included a Combined Heat and Power (CHP) unit to meet the strict
planning requirements and efficiently provide hot water for the hotel.

In addition, the full mechanical and electrical services were design in compliance with Hilton brand standards.

Project Benefits

  • Fully complaint and efficient solutions -

    ONE's building services team always considers efficiency in their designs to optimise a buildings performance as well as ensuring compliance

  • Trusted with high quality projects -

    ONE works across sectors and delivers time and time again for our clients. The team worked seamlessly with the rest of the design team and this project resulted in a highly efficient brand standard hotel on harbourside in Torquay.

  • Approachable and client focused -

    Our M & E engineers are easily accessible and provide the personal touch for every project